Recent Projects > Westlink (Broadway Section)



Main Contractor
HMC (Graham, Farrans, Bilfinger)
Project Location
Belfast
Project Details
The first contract awarded to us in July 2006 by Highway Management Construction (HMC) was on the Broadway section. This work consisted of the reconstruction of the Clowney and Blackstaff culverts.

The project involved the construction of a twin culvert 12m wide x 2.2m high and 170m long. The single culvert was 4.5m wide x 2.2m high and 350m long. The single culvert was a mixture of straight and radius construction. All the culverts were cast in 6.0m sections. At the end of the twin culvert there was an overflow chamber 37m x 15m with an 800mm deep base slab, 800mm thick walls and 1.15m deep roof slab. The total project quantities were approx 12,500m² of wall formwork, 5,800m3 of concrete and 1,200 tons of reinforcement.


Talk To Us

Useful Links

KHC Projects
Our Clients
Health & Safety
KHC Services:
ArrowQuantity Surveying
ArrowCivil Engineering
ArrowSite Setting
ArrowConstruction
ArrowShuttering Joinery
ArrowConcrete Construction

Offices

Head Office, Armoy
76 Drones Road, Armoy
Ballymoney, Co. Antrim
Northern Ireland, BT53 8UP

Belfast Office
90 Duncrue Street
Belfast, BT3 9AR

Isle of Man Office
6th Floor Victory House, Prospect Hill
Douglas, Isle of Man, IM1 1EQ

Contact

mail@khenryconstruction.com
Head Office:
+44 (0)28 2075 1454
Belfast Office:
+44 (0)28 9074 2229
IoM Office:
+44 (0)1624 667726


Mini Logo© K. Henry Construction Ltd. 76 Drones Road, Armoy, Ballymoney. Company Reg No: NI 42999