Recent Projects > Westlink (Broadway Section)
Main Contractor
HMC (Graham, Farrans, Bilfinger) Project Location Belfast Project Details The first contract awarded to us in July 2006 by Highway Management Construction (HMC) was on the Broadway section. This work consisted of the reconstruction of the Clowney and Blackstaff culverts. The project involved the construction of a twin culvert 12m wide x 2.2m high and 170m long. The single culvert was 4.5m wide x 2.2m high and 350m long. The single culvert was a mixture of straight and radius construction. All the culverts were cast in 6.0m sections. At the end of the twin culvert there was an overflow chamber 37m x 15m with an 800mm deep base slab, 800mm thick walls and 1.15m deep roof slab. The total project quantities were approx 12,500m² of wall formwork, 5,800m3 of concrete and 1,200 tons of reinforcement. |
||
Useful LinksKHC Projects
Our Clients Health & Safety KHC Services: Quantity Surveying
Civil Engineering
Site Setting
Construction
Shuttering Joinery
Concrete Construction
Offices
Head Office, Armoy
76 Drones Road, Armoy Ballymoney, Co. Antrim Northern Ireland, BT53 8UP Belfast Office 90 Duncrue Street Belfast, BT3 9AR Isle of Man Office 6th Floor Victory House, Prospect Hill Douglas, Isle of Man, IM1 1EQ Contact
mail@khenryconstruction.com Head Office: +44 (0)28 2075 1454
Belfast Office: +44 (0)28 9074 2229
IoM Office: +44 (0)1624 667726
© K. Henry Construction Ltd. 76 Drones Road, Armoy, Ballymoney. Company Reg No: NI 42999 |